HVAC and EV Charger — Can Your Electrical Panel Handle Both?

Published: July 23, 2026 — CANRO Heating & Cooling — Greater Vancouver, BC

Panel Capacity Issues

A 100-amp panel in a typical Vancouver home can handle: furnace + hot water (gas) + range + dryer = approximately 60-70 amps used. Adding a 30-50 amp heat pump and a 30-50 amp EV charger would exceed capacity. A 200-amp panel is usually sufficient for all loads including heat pump and EV charger.

Solutions Without Panel Upgrade

Load management devices (EV charger + heat pump sharing): automatically adjust charging speed based on total home load — $500-1,500. Smaller heat pump (ducted mini-split uses less power): 15-20 amps vs 30-60 amps for central heat pump. Lower-amperage EV charger (16-24 amps instead of 40-50): charges slower but uses less capacity. Stagger usage: charge EV at night when the heat pump is not running.

Panel Upgrade Costs

Upgrading from 100-amp to 200-amp service: $2,500-5,000 including new panel, meter base, permit, and BC Hydro connection. If you plan to add both a heat pump and an EV charger within 5 years, upgrading now is more cost-effective than two separate upgrades. Some CleanBC programs offer incentives for panel upgrades when combined with heat pump installation.

Safety Reminder

If you smell gas, suspect carbon monoxide or believe there is an immediate danger, leave the property and contact emergency services or the appropriate gas emergency authority. Do not remain inside — exit the building immediately and call for help from outside.